Project Background

This project was initiated by Isle of Wight County and will be locally managed by Isle of Wight County Public Works - Transportation Division, in partnership with Virginia Department of Transportation (VDOT).  The project will be fully funded through Smart Scale funding.

Project Summary

This project improves the intersection of US Route 460 at US 258 by modifying the the turn lanes and pedestrian facilities. The additional turn lanes at this intersection will help improve operations with protected-permissive phasing. The proposed sidewalks and pedestrian facilities will help improve safety for pedestrians along US Route 460 and US Route 258.

Project Information

Please see the exhibit map below that shows the upcoming improvements as well as a link to the current project schedule. More information will be posted as the project progresses.
US 460 US 258 Intersection Improvements1024_1

Operational Anaylsis

Timmons Group performed an operational analysis for this project that addresses the queue length under both, the existing and future (2031) analysis timeframes. Please click here to view their final report.

Project Updates

Isle of Wight County Transportation Department is continuing the process of designing improvements to the US Route 460 and US Route 258 turn lanes and pedestrian facilities in Windsor.

Timmons Group has been contracted as the lead project design firm for the project.

Environmental Documents
Please click here to view the Programmatic Categorical Exclusion (PCE) that has been authorized for this project.

20% Design Plans, Project Schedule, Project Cost Estimate
20% Design Plans
Current Project Schedule- January 2024
Project Cost Estimate
Please click here to view the Survey Notice that was mailed to affected property owners in April 2023.
60% - Public Hearing Plans
Introduction & Traffic Control
Details
Cross Sections
Project Schedule as of May 2024
Environmental /NEPA Documents
60% Right of Way Plans
Introduction & Traffic Control Details
Details
Cross Sections
Project Schedule as of October 2024
90% Design Plans, Project Schedule
Introduction & Traffic Control
Details
Cross Sections
Project Schedule as of January 2025
Please click here to view the NWP verification document from the Army Corp. of Engineers
100% Design Plans - Approved for Advertisement
Introduction & Traffic Control
Details
Cross Sections
Invitation for Bid posted was posted on 8/24/2026. Please click here to view IFB# 2027-4545-0282.

Notice of Willingness

Please CLICK HERE to view the Notice of Willingness to hold a public hearing. If you have any questions, concerns, or comments, please complete the questionnaire below and we will be gladto respond to your request.  Any requests for a public hearing must be received by September 13, 2024.


0 found in 0 section(s)
  • 20% Design Plans
  • Current Project Schedule- January 2024
  • Project Cost Estimate
  • Please click here to view the Survey Notice that was mailed to affected property owners in April 2023.
  • Introduction & Traffic Control
  • Details
  • Cross Sections
  • Project Schedule as of May 2024
  • Environmental /NEPA Documents
  • Introduction & Traffic Control Details
  • Details
  • Cross Sections
  • Project Schedule as of October 2024
  • Introduction & Traffic Control
  • Details
  • Cross Sections
  • Project Schedule as of January 2025
  • NWP verification document from the Army Corp. of Engineers