Route 10 / Route 644 Turn Lane Project - UPC# 119216
Project Background
This project was initiated by Isle of Wight County and will be locally managed by Isle of Wight County Transportation Department, in partnership with the Town of Smithfield and Virginia Department of Transportation (VDOT). This project is fully funded with Smart Scale funding.
Project Summary
The goal of this project is to improve the existing westbound exclusive left-turn lane at the Turner Drive/Benns Church Boulevard intersection in Smithfield, VA. The existing westbound Benns Church Boulevard left-turn lane provides approximately 75 feet of full-width storage with approximately 100 feet of taper. The project improvements will consist of extending the existing left-turn at total of 225-feet (i.e., 175 feet of additional full-width storage and an additional 50 feet of taper). It is noted that the referenced left-turn land serves the westbound Benns Church Boulevard to southbound Turner Drive movement which is compromised of a large amount of traffic destined to Smithfield High School, located to the south. The proposed improvements will result in a modified left-turn lane consisting of 250 feet of storage and 150 feet of taper, capable of accomodating existing and projected vehicular queuing during the AM and PM peak hours.
Project Information
Please see the exhibit map below that shows the upcoming improvements. Project information will continue to be updated as it becomes available.
Operational Analysis
Kimley Horn and Associates performed an operational analysis for this project that addresses the existing 2025 conditions and the 2034 No Build and Build conditions at Benns Church Blvd. and Turner Drive. Please click here to view their final report.
Project Updates
Isle of Wight County Transportation Department is continuing the process of designing improvements to the left-turn lane at the Turner Drive/ Benns Church Boulevard intersection in Smithfield.
Kimley Horn and Associates has been contracted as the lead project design firm for the project.
Environmental Documents
Please click here to view the EQ-429 environmental document.
30% Design Plans, Project Cost Estimate
